Schemes, Credit Limits and Routes: Let the System Remember

Our software Published 21 November 2026 · 4 min read · Vanya Infosystems

In distribution, every customer has a different rate, scheme and credit position. When all three live in someone's head, one wrong bill costs the margin on the order.

A distribution business runs on three things: the rate a customer gets, the scheme that applies this month, and how much credit they are allowed. In most businesses all three live in somebody's head. That works until that person is on leave, or busy, or simply wrong.

The cost of one wrong bill

Apply last month's scheme to this month's invoice, or give a customer the rate meant for a bigger buyer, and the margin on the whole order is gone. Allow one more delivery to a customer who is already overdue, and the outstanding grows quietly until it becomes a problem.

Rates and schemes applied by the system

The fix is to move these rules out of memory and into the software. Price lists can be set by customer group, quantity and region. Schemes and discounts are applied by the system at the moment of billing, so they cannot be given on the wrong bill - or forgotten on the right one.

Credit checked before the bill, not after

The credit limit and any overdue amount are checked at billing time. If a customer is over the limit, the system blocks the bill instead of someone discovering the problem at month end.

Routes, vans and collections

The same system plans routes and beats for the field team, records what is loaded on the van and what comes back, and takes the collection entry that follows the delivery. Secondary sales and collections can come straight from the field app.

What it gives the owner

Instead of trusting that the rules were followed, the owner can see that they were. That is the difference between a distribution business that grows and one that grows its outstanding.

Questions

How long does a custom ERP project take?

It depends entirely on how many parts of the business are in scope. A focused module - billing and stock, say - is usually measured in weeks; a full operations system across purchase, production, stores, sales and accounts is measured in months. We give you a stage-by-stage plan with dates after the requirement discussion, and you see working software long before the last stage.

What does it cost?

We quote per project, after the requirement conversation, because the honest answer depends on what has to be built. There is no price list on this page for that reason. The quotation separates one-time development from anything that recurs, so you can see exactly what you are committing to.

Can you work with the software we already use?

Usually, yes. Where an existing system is doing its job we integrate with it rather than replacing it, and where data has to move between systems we build that properly instead of leaving somebody to re-type it. The consulting engagement starts by working out which of your systems are worth keeping.

What happens to the data in our current system?

It is migrated and reconciled before go-live. Masters - items, parties, employees - come across first and are checked by your own staff; balances and open documents follow. We run the old and the new method side by side until the figures agree.

Ready to Build Something Smarter?

Let us discuss how the right technology can simplify your operations and support your next stage of growth.

Or call +91 87009 95511 · info@vanyainfosystems.com